The Petal Loop Stitch Collection

A Cozy, Coordinated Christmas — All From One Beautiful Stitch

Four festive crochet patterns built around one signature stitch, so your whole holiday home looks pulled together instead of pieced from four random patterns.

Instant digital download · 4.9★ from 22,800+ shop reviews · Print at home & keep forever

A woman stands indoors holding a crocheted ornament. Behind her are crocheted stockings, yarn, and a chevron-patterned blanket, all arranged as holiday decor.

Picture the mantel you actually want

The holidays should be for creating, not stressing

A textured stocking hung with care. Ornaments you made yourself. A blanket folded over the couch. Little handmade touches in every corner — all matching, all intentional, all yours.

That’s what this collection was built for: a home full of handmade pieces you’re proud of, made one textured piece at a time.

Briana standing beside a mantel styled with the Petal Loop crochet collection

You know the holiday-crochet spiral

Four patterns, four styles

You piece together a stocking here, an ornament there — and nothing quite matches. The mantel ends up looking busy instead of intentional.

Relearning every time

Each new pattern means a new stitch, a new rhythm, a new learning curve — right when your December time is already stretched thin.

Confusing instructions

Vague steps and missing photos turn a project that should feel cozy into one more thing to stress about before the guests arrive.

What if you could learn one gorgeous stitch and use it to make your whole holiday set?

The idea that ties it all together

Learn the stitch once. Use it everywhere.

Every pattern leans on the same Petal Loop Stitch. You learn the rhythm on a quick washcloth in an afternoon, and that same muscle memory carries you all the way up to a king-size blanket. No relearning between projects. No starting from scratch.

Start here

Washcloth

An afternoon project to learn the stitch on.

Build on it

Ornament

A quick stash-buster, perfect for gifting in multiples.

Grow it

Stocking

A textured heirloom for the mantel.

Go big

Blanket

Sized from lap to king, go as big as you dare.

What’s inside the bundle

Four patterns, one cohesive look

The Ornament

A quick make, perfect for gifting in multiples

The stash-buster of the collection. Whip up a handful in an evening for teacher gifts, package toppers, and neighbor surprises, each one a little handmade moment.

Perfect for: package toppers, co-worker gifts, and using up every last bit of your holiday yarn.

Petal Loop crochet ornaments in holiday colors

The Stocking

A textured heirloom for the mantel

Substantial, textured, and made to last, the stocking that becomes part of the family’s Christmas tradition. Make one in every colorway so no one’s left with the odd stocking out.

Perfect for: the centerpiece of your mantel, and the piece everyone will ask you to make for them next year.

Petal Loop crochet stocking in evergreen, cream, and cranberry

The Washcloth

The perfect afternoon project to learn on

Start here. This quick, satisfying make teaches you the Petal Loop Stitch in a single sitting — so by the time you reach the blanket, the rhythm is already in your hands.

Perfect for: your very first Petal Loop project — and a lovely little gift once you’ve made a few.

Petal Loop chevron crochet washcloth

The Blanket

Sized from lap to king, go as big as you dare

The same Petal Loop rhythm, scaled up into a chevron blanket you’ll reach for all winter. Full sizing means you choose exactly how cozy to go.

Sized your way: make it as a lap throw for the couch or size up to a full bed blanket. One pattern covers them all with 15 sizes, so you can make the same design for everyone on your list.

Petal Loop chevron crochet blanket in sage, evergreen, and cream

Not just patterns

A done-for-you gifting & organizing kit

Because the holidays aren’t only about the making, they’re about the giving. Every download includes a full printable collection to make your season easier.

Three knitted holiday stockings in green, red, and white are arranged close together, each with a tag reading \"Happy Holidays\" and surrounded by greenery.

Gift & stocking tags

Mini tags and stocking tags ready to print, so every handmade gift arrives finished.

Christmas project planning template with sections for project details, yarn colors, number of balls, recipient, date, tools, notes, and yarn inventory.

Project planner page

Map out your holiday crafting and gift-giving so nothing sneaks up on you in December.

A grid labeled \"Row Counter\" with numbered circles from 1 to 120, instructing users to mark an X after completing each row or round. Decorative leaf designs are in the corners.

Row counter

A printable counter to keep your place, no more losing track mid-row.

Humorous gift tags

Humorous gift tags

A little wink for the people who make you laugh. Because handmade can be funny, too.

Two crocheted blankets and two rolls of yarn with festive \"Merry Christmas\" labels are displayed on a wooden surface beside four brown handmade item tags.

Washcloth printables

Six design options so you can dress up your finished washcloths for gifting.

Keep it forever

Keep it forever

Everything is yours to download, print, and re-use for every holiday season to come.

Every pattern includes

Simple black outline drawing of a pencil on a light green background.

Written instructions

In standard US crochet terms

Crochet chart pattern with five rows and five columns, various crochet stitch symbols, and a crochet hook in the lower right corner.

Charts & schematics

Visual stitch guides

A solid dark green right-pointing triangle, resembling a play button, on a light green background.

Video Tutorials

For every key step

A solid dark green heart shape centered on a light green square background.

Beginner-friendly

Notes for the Petal Loop Stitch

A large, solid dark green downward-pointing arrow centered on a light green background.

Instant download

Print or stitch from your screen

A dark green infinity symbol on a light green background.

Keep it forever

Re-use every season ahead

★ ★ ★ ★ ★

Makers keep coming back

4.9★ average from 22,800+ reviews across the Briana K Designs shop.

★ ★ ★ ★ ★

I LOVE Briana K’s designs! Her patterns are clearly written and easy to follow, and she has so many supporting videos. One of my favorite things she provides is the super packaging and labeling printables for gifting/selling these beautiful creations.

Nancy
Verified maker

★ ★ ★ ★ ★

Wonderful pattern! Such an easy item to make and Briana’s patterns are always well written , clear and easy to follow. She includes links to her video tutorials as needed, tips and this one included gift tags to print too!

Anita
Verified maker

★ ★ ★ ★ ★

I really enjoy all of Briana’s patterns, and the video tutorials are always fantastic and super helpful. I would definitely recommend her patterns without hesitation!

Lee
Verified maker

Get the collection

Your whole holiday, handled in one download

Four coordinated patterns plus the full printable gifting kit — instant, and yours to keep forever.

The Petal Loop Holiday Collection

4 patterns · printable gifting kit · instant download

$14.99 $49.97

Save 70% — limited-time launch price

✓ Instant download, no waiting.

A woman in a cream cardigan holds up a green crocheted stocking with a tag, standing in front of a festive, decorated display with holiday stockings.

A quick note from me

Hey, I’m Briana

The holidays should be for creating, not stressing. This collection is my way of helping you build a cozy, coordinated Christmas one textured piece at a time, so you end up with a home full of handmade pieces you’re proud of.

Learn the stitch once, make it your own, and gift the finished pieces to the people you love. I can’t wait to see your mantel.

Cheers, Briana

Questions, answered

Is this a physical product?

No — this is an instant digital download. Nothing ships. Your PDF patterns and printables are available immediately after purchase to download, print, and keep forever.

How long are the videos and patterns available?

Your time is YOUR time. This is not a live class, you can press pause and rewind on the videos, and start whichever project you like. We don’t want you to feel rushed. You have unlimited access to the patterns through your Shopify, Etsy or Ravelry profile to download at any time.

I’m a beginner. Can I do this?

Yes. That’s exactly why the collection starts with the washcloth, it teaches you the Petal Loop Stitch in an afternoon. Every pattern includes beginner-friendly notes, written instructions in standard US terms, charts, and clear step photos.

You will need to know the basic crochet skills, such as chain, single crochet, half double crochet, etc. Whether you’re a beginner or have some experience under your belt, our tutorials have got you covered. We believe in inclusive learning, so everyone is welcome to join us on this fun crochet journey. Let’s learn new techniques and have a blast along the way!

Can I purchase the patterns individually?

Yes! Each pattern is listed individually on Etsy or Ravelry. Some of them are also available on my blog with ads, not all patterns will be posted online at this time. The best deal, however is the course.

Can I sell what I make?

Finished items you make from these patterns are yours to keep, gift, or sell in small amounts with credit to Briana K Designs. The pattern files themselves are copyrighted for personal use — please don’t share, copy, or resell the files.

Where can I ask Questions?

We don’t shut down after purchase like an in-person class. Because this is an online platform, you can ask away, and we will get back to you in a timely fashion.
We also have the Briana K Community on Facebook as a great resource to connect with other crocheters in the course. https://www.facebook.com/groups/BrianaK

A wooden sideboard decorated with green garland, crochet stockings, yarn, and a chevron-patterned crochet blanket, with vases and neatly stacked towels on top and shelves below.

Make this the year your mantel finally matches

One beautiful stitch. Four coordinated pieces. A cozy, handmade holiday you’ll be proud of.

Instant digital download. No physical item will be shipped. Patterns are copyrighted for personal use — please don’t share, copy, or resell the files. Finished items are yours to keep, gift, or sell in small amounts with credit to Briana K Designs. © 2026 Briana Kepner (Briana K Designs). All Rights Reserved.

More Crochet Collections